top of page

FINAL REPORT

The following final report documents the results of a structural redesign of The Health Centre, including investigations into cost and scheduling implications. An electronic version of the final report can be accessed below, as well as the executive summary. Please note that this is the document version submitted to satisfy BAE/MAE requirements. An additional version of this thesis was submitted to the Schreyer Honors College and can be accessed throught the Schreyer Thesis Archive.

EXECUTIVE SUMMARY

FULL REPORT

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewithin is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Hannah Valentine. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

 

This site was last updated April 10, 2016 by Hannah Valentine and was created using Wix.com

bottom of page